Our Projects

PATCHI NEW FACTORY- SIBLINE (2014)
PATCHI NEW FACTORY- SIBLINE (2014)

Construction of the new State-of-the-art Chocolate manufacturing Plant, complying with HACCP food management system, (Hazard Analysis & Critical Control Points). read more →

EDGE TOWER, ACHRAFIEH- BEIRUT (2016)
EDGE TOWER, ACHRAFIEH- BEIRUT (2016)

220 m tall high-rise building. 8 basements, Ground Floor & 52 above-ground floors. Total floor area: 57,000 m2. read more →

FRENCH EMBASSY COMPOUND ENTRANCES (2018)
FRENCH EMBASSY COMPOUND ENTRANCES (2018)

Rehabilitation of all entrances related to the French Embassy Compound. read more →

ANNEXIO HOTEL- ABDEL-WAHAB STREET- BEIRUT (2015)
ANNEXIO HOTEL- ABDEL-WAHAB STREET- BEIRUT (2015)

Concrete works, Concrete structure of the New Hotel. read more →

ONE OAK- BCD, SOLIDERE- BEIRUT (2013)
ONE OAK- BCD, SOLIDERE- BEIRUT (2013)

Residential building in Marfaa, SOLIDERE. Concrete works. read more →

CITY VIEW- ACHRAFIEH- BEIRUT (2013)
CITY VIEW- ACHRAFIEH- BEIRUT (2013)

Residential building. Total floor Area : 4,500 m2. All Trades. read more →

SAINT GEORGE HOSPITAL, ACHRAFIEH-  BEIRUT (2013)
SAINT GEORGE HOSPITAL, ACHRAFIEH- BEIRUT (2013)

Hospital extension and helipad. Concrete and Architectural works, Electro-mechanical First-fix, Stone cladding. read more →

RESIDENCE DES PINS- BEIRUT (2014)
RESIDENCE DES PINS- BEIRUT (2014)

Rehabilitation of the infrastructure of the French Ambassador's Residence compound (Residence des Pins). read more →

FRANSABANK- ALEY (2012)
FRANSABANK- ALEY (2012)

New Aley branch. All Trades. read more →