PROJECT DETAILS
Status : Completed
Client : QATAR - ASHGHAL
Architect, Consultant : DAR-AL-HANDASAH
Period of Execution : 2006 - 2008
Description : Construction of all the concrete infrastructure of the round-about, including 2 highway bridges, each 90 m long, 2 pedestrian bridges, 35 m. long and 3,000 m long tunnels and retaining walls. All trades.