ALGORITHM NEW PHARMACEUTICAL PLANT (2O18)
Construction turn-key of the new manufacturing facilities of ALGORITHM SAL Company.
The new factory, including administrative and Physical plant buildings, located in the outskirts of Beirut, above Nahr-el-Kalb area, includes 4 basements, Lower- Ground-floor, Upper Ground-floor and 3 floors, for a total of 15,000 m2 built area, set to be completed in 18 months.
The construction premises will be equipped with the latest environmental technology.
PROJECT DETAILS
Status: In Progress
Owner: ALGORITHM SAL.
Architect: SKP Samir Khairallah & Partners, Architects, Planners, Engineers.
www.skp-consultants.com
Structural Engineer: Bureau D'etudes Rodolphe Mattar Sarl
MEP consultants: ELIE SALEH (Electrical) & SAMIR JAMOUS (Mechanical)
www.esc-lb.com
Construction Period: 18 months.