ALGORITHM NEW PHARMACEUTICAL PLANT (2O18)

  • Perspective view#2
    Perspective view#2

    View of the manufacturing plant and administrative building

  • Basement 4, 7.30 m high
    Basement 4, 7.30 m high
  • Basement 4 top slab under construction

  • Construction of underground structure

Construction turn-key of the new manufacturing facilities of ALGORITHM SAL Company.

The new factory, including administrative and Physical plant buildings, located in the outskirts of Beirut, above Nahr-el-Kalb area, includes 4 basements, Lower- Ground-floor, Upper Ground-floor and 3 floors, for a total of 15,000 m2 built area, set to be completed in 18 months.

The construction premises will be equipped with the latest environmental technology.