Our Projects
DAR-AL-AYTAM JADRA SCHOOL (2015)
Secondary school in JADRA, South Lebanon. Donation from Hajj Nizar CHOUCAIR, (PATCHI GROUP) read more →
AL BUSTAN HAMMAM & SPA (2016)
Construction of a state-of-the-art Hammam & Spa Center in the AL-BUSTAN HOTEL Touristic Complex read more →
AAR- AAMCHIT PRIVATE COMPOUND (2016)
Construction of a Private Residential Compound in AAMCHIT area, including Villas, swimming pool, central kitchen, Guest House, Library. read more →
SURSOCK YARDS TOWER- ACHRAFIEH- BEIRUT (2015)
Residential building. 5 basements, Ground Floor and 20 floors tower. read more →
ATHENEE DE BEYROUTH SCHOOL EXTENSION- BSALIM (2013)
Construction of the new extension. All Trades except MEP. read more →
NICOLAS SURSOCK MUSEUM- BEIRUT (2013)
Construction of the new underground building of the Museum and refurbishment of the actual palace. All Trades. read more →
PATCHI NEW FACTORY- SIBLINE (2014)
Construction of the new State-of-the-art Chocolate manufacturing Plant, complying with HACCP food management system, (Hazard Analysis & Critical Control Points). read more →
EDGE TOWER, ACHRAFIEH- BEIRUT (2016)
220 m tall high-rise building. 8 basements, Ground Floor & 52 above-ground floors. Total floor area: 57,000 m2. read more →
FRENCH EMBASSY COMPOUND ENTRANCES (2018)
Rehabilitation of all entrances related to the French Embassy Compound. read more →
